Account 154 – Work in progress
Extract from Appendix II – Circular 99/2025/TT-BTC dated 27 October 2025 of the Ministry of Finance, applicable to financial years beginning on or after 1 January 2026.
Category: Asset accounts
See also: Accounting principles for inventories
1. Accounting principles
a) This account is used to accumulate production and business costs for the purpose of calculating the cost of products and services in the enterprise.
b) Account 154 – Work in progress records production and business costs in progress at the beginning of the period, incurred during the period and in progress at the end of the period, and the production and business costs of the quantity of products and services completed during the period, for main and ancillary production and business activities and outside processing in manufacturing enterprises or service enterprises.
c) Depending on the characteristics of its production and business activities and its management requirements, the production and business costs recorded in Account 154 may be detailed by the location where costs are incurred (factory, production department, production team, construction site, etc.); by type or group of products or by product component or part; by type of service or by service stage, etc.
d) The production and business costs recorded in Account 154 comprise the following:
- Direct raw material costs for manufacturing products, processing and rendering services;
- Direct labour costs for manufacturing products, processing and rendering services;
- Construction machinery costs (for construction and installation activities);
- Manufacturing overheads directly serving the manufacture of products, processing and rendering of services;
dd) At the end of the period, fixed manufacturing overheads are allocated and transferred to the conversion costs of each unit of product on the basis of normal capacity. Where actual output is lower than normal capacity, the enterprise must calculate and determine the fixed manufacturing overheads allocated to the conversion costs of each unit of product on the basis of normal capacity. Unallocated fixed manufacturing overheads (not included in the cost of products) are recognised in cost of goods sold for the period. Variable manufacturing overheads are fully allocated to the conversion costs of each unit of product on the basis of the actual costs incurred.
e) The following costs are not recorded in Account 154:
- Selling expenses;
- General and administrative expenses;
- Financial expenses;
- Other expenses;
- Corporate income tax expense;
- Capital construction investment expenditure;
- Expenditure funded from other sources.
2. Accounting method for Account 154 in industry
a) Account 154 – Work in progress, as applied in industry, is used to accumulate production costs and calculate the cost of products by factory or by department producing and manufacturing the products. For manufacturing enterprises that engage in outside processing, or provide labour services and services to outside parties or to serve the manufacture of products, the costs of these activities are also accumulated in Account 154.
b) Depending on the enterprise’s management requirements, Account 154 in industrial manufacturing enterprises may be accounted for in detail by the location where costs are incurred (factory, production department) or by type or group of products, by product, or by product component, etc.
3. Accounting method for Account 154 in the service sector
a) Account 154 – Work in progress is applied in service enterprises (transport, postal services, tourism, services, etc.) to accumulate production costs and calculate the cost of services performed. Depending on the enterprise’s management requirements, this account may be accounted for in detail by service business line such as transport, tourism, etc., or by the location where costs are incurred, or by individual service, etc.
b) For transport:
- This account is used to accumulate costs and calculate the cost of transport services, and may be detailed by sector such as road transport, rail transport, waterway transport, air transport, pipeline transport, etc., or by activity (passenger transport, freight transport, etc.) or by service business unit, etc.
- In providing transport services, replacement tyres and inner tubes are usually used over several periods, so the entire value of the tyres and inner tubes is not charged to the cost of transport services in one go when issued for use but may be allocated gradually over several periods.
c) For tourism business activities
This account is used to accumulate costs and calculate the cost of tourism services; depending on the enterprise’s management requirements, it may be detailed by type of activity such as tour guiding, tourist transport services, etc.
d) For hotel business activities
This account is used to accumulate costs and calculate the cost of hotel services; depending on the enterprise’s management requirements, it may be detailed by type of service such as food and beverage, room services, recreation and entertainment services, and other services (laundry, ironing, hairdressing, telegraph, sports, etc.).
4. Accounting method for Account 154 in construction
a) Account 154 – Work in progress is applied in construction and installation enterprises to accumulate production costs and calculate the cost of construction and installation products performed. Depending on the enterprise’s management requirements, this account may be accounted for in detail by construction and installation activity, such as industrial construction and installation, civil construction and installation, etc., or by construction and installation product, etc.
b) The accumulation of production costs and the calculation of the cost of construction and installation products must be detailed by construction work, work item and cost item (direct raw materials, direct labour, construction machinery, manufacturing overheads, etc.) in accordance with the prevailing laws on investment and construction management.
c) Real estate developers use this account to accumulate the construction costs of finished real estate products. Where the real estate being constructed is used for several purposes (as offices, for lease or for sale, for example a mixed-use apartment building), the following principles apply:
- If there is sufficient basis to account separately for, or to determine the proportions of, the construction costs of real estate for sale (finished real estate products) and the construction costs of real estate for lease or for use as offices (fixed assets or investment property), only the construction costs of the finished real estate products are recorded in Account 154, while the construction costs of the fixed assets or investment property are recorded in Account 241 – Construction in progress.
- Where it is not possible to account separately for, or to determine the proportions of, the construction costs of the components that are finished real estate products, fixed assets or investment property, the enterprise accumulates all costs directly attributable to the construction investment of the assets in Account 241 – Construction in progress. When the construction work or project is completed, handed over and put into use, the enterprise transfers the construction investment costs according to the nature of each type of asset, based on the way the assets are actually used.
5. Structure and content of Account 154 – Work in progress
Debit side:
- Transfer of direct raw material costs, direct labour costs, construction machinery costs and manufacturing overheads incurred during the period relating to the manufacture of products and the performance of services;
- Value of raw materials and supplies issued for outside processing, costs of transporting materials to the processing location, and outside processing fees;
- Direct raw material costs, direct labour costs, construction machinery costs and manufacturing overheads incurred during the period relating to construction and installation products;
Credit side:
- Actual production cost of products manufactured and received into the warehouse or transferred directly for sale, internal consumption, or immediate use for capital construction activities, etc.
- Value of raw materials and supplies and goods processed and received back into the warehouse or put to immediate use in activities;
- Actual cost of the quantity of services completed and provided to customers;
- Production cost of construction and installation products completed and handed over in part or in full that are sold during the period or awaiting sale, or handed over to the main construction and installation contractor, etc.;
- Value of scrap recovered and value of defective products that cannot be repaired.
Debit balance:
Production and business costs still in progress at the end of the accounting period.
The enterprise may open additional detailed work in progress accounts to suit the characteristics of its production and business activities and its management requirements.
6. Accounting method for certain major economic transactions in industry
a) At the end of the period, transfer direct raw material costs by cost object, as follows:
Dr Account 154 – Work in progress
Dr Account 632 – Cost of goods sold (material costs in excess of normal levels)
Cr Account 621 – Direct raw material costs.
b) At the end of the period, transfer direct labour costs by cost object, as follows:
Dr Account 154 – Work in progress
Dr Account 632 – Cost of goods sold (direct labour costs in excess of normal levels)
Cr Account 622 – Direct labour costs.
c) Where actual output is higher than or equal to normal capacity, at the end of the period the enterprise must calculate, allocate and transfer all manufacturing overheads (variable and fixed manufacturing overheads) to each cost object, as follows:
Dr Account 154 – Work in progress
Cr Account 627 – Manufacturing overheads.
d) Where actual output is lower than normal capacity, the enterprise must calculate and determine the fixed manufacturing overheads allocated to the conversion costs of each unit of product on the basis of normal capacity for inclusion in the cost of products. Fixed manufacturing overheads not included in the cost of products in accordance with regulations are recognised in cost of goods sold for the period, as follows:
Dr Account 154 – Work in progress
Dr Account 632 – Cost of goods sold (fixed manufacturing overheads not allocated to the cost of products)
Cr Account 627 – Manufacturing overheads.
dd) Where, after materials have been issued for production, the enterprise receives a trade discount or price reduction relating to those materials, the enterprise records a reduction in work in progress for the portion of the trade discount or price reduction received that corresponds to the materials issued for the production of work in progress, as follows:
Dr Accounts 111, 112, 331,…
Cr Account 154 – Work in progress (portion of the trade discount or price reduction received corresponding to the materials issued for the production of work in progress)
Cr Account 133 – Deductible VAT (1331) (if any).
e) Value of raw materials and supplies issued for outside processing and received back into the warehouse, record:
Dr Account 152 – Raw materials and supplies
Cr Account 154 – Work in progress.
g) Value of defective products that cannot be repaired, for which the person causing the damage must pay compensation, record:
Dr Account 138 – Other receivables (1388)
Dr Account 334 – Payables to employees
Cr Account 154 – Work in progress.
h) Actual cost of products received into the warehouse during the period, record:
Dr Account 155 – Products
Cr Account 154 – Work in progress.
i) Where finished products are not received into the warehouse but are delivered directly to the buyer (electricity, water, etc.), record:
Dr Account 632 – Cost of goods sold
Cr Account 154 – Work in progress.
k) Where products manufactured are used immediately for internal consumption or issued for capital construction activities without being received into the warehouse, record:
Dr Accounts 241, 641, 642,…
Cr Account 154 – Work in progress.
7. Accounting method for certain major economic transactions in the service sector
The accounting method for certain major economic transactions in Account 154 in service enterprises is similar to that in industry. In addition, note the following:
a) Transfer of the actual cost of the quantity of services completed, delivered to the buyer and determined to have been sold during the period, record:
Dr Account 632 – Cost of goods sold
Cr Account 154 – Work in progress.
b) When services are used for internal consumption, record:
Dr Accounts 641, 642
Cr Account 154 – Work in progress
Cr Account 3331 – VAT payable (if any).
8. Accounting method for certain major economic transactions in construction
8.1. Method of accounting for the accumulation of construction and installation costs:
a) Direct raw material costs:
- Direct raw material costs comprise: the actual value of principal materials, ancillary materials, components or separate parts, and revolving materials that form the substance of the construction and installation product or help in the performance and completion of the construction and installation work (excluding ancillary materials for construction machinery and vehicles and materials included in overheads).
- As a principle of accounting, raw materials and supplies used for the construction of a particular construction work/work item must be charged directly to that construction work/work item on the basis of source documents, according to the quantity actually used and the actual cost of the raw materials and supplies issued.
- At the end of the accounting period or when the construction work/work item is completed, the raw materials and supplies remaining at the production site (if any) are counted in order to reduce the direct raw material costs issued for that construction work/work item.
- Where the enterprise cannot determine direct raw material costs for each construction work or work item, it may allocate raw materials and supplies to the users on an appropriate basis. The enterprise must disclose in detail the basis for allocating raw materials and supplies in the financial statements. Based on the Material allocation schedule for each construction work or work item, record:
Dr Account 154 – Work in progress (material costs)
Dr Account 632 – Cost of goods sold (direct raw material costs in excess of normal levels)
Cr Account 621 – Direct raw material costs.
b) Direct labour costs are accounted for by the enterprise in the same way as in industry
c) Construction machinery costs:
- Construction machinery costs comprise: the costs of construction machinery used to perform construction and installation work by machine. Construction machinery is machinery that directly serves the construction and installation of works. It is machinery driven by steam, diesel, petrol, electric engines, etc. (including machinery serving construction and installation). Construction machinery costs may be classified into recurring costs and temporary costs, where:
- Recurring costs for the operation of construction machinery comprise: labour costs for operating and servicing the machinery, etc.; material costs; tool and instrument costs; depreciation of fixed assets; outsourced service costs (minor repairs, electricity, water, vehicle and machinery insurance, etc.); other cash expenses.
- Temporary costs for the operation of construction machinery comprise: costs of repairing and servicing construction machinery (major overhauls, medium overhauls, etc.) that do not qualify for an increase in the historical cost of the construction machinery; costs of temporary works for construction machinery (tents, sheds, platforms, machine rails, etc.). Where temporary construction machinery costs are incurred in advance and relate to several periods, they are recorded on the debit side of Account 242 – Deferred costs when incurred and subsequently allocated gradually to the debit side of Account 623 – Construction machinery costs.
- The accumulation of costs and the calculation of the cost of construction machinery use must be accounted for separately for each construction machine (see the guidance for Account 623 – Construction machinery costs).
- Based on the Construction machinery cost allocation schedule (actual cost per machine shift) for each construction work or work item, record:
Dr Account 154 – Work in progress
Dr Account 632 – Cost of goods sold (construction machinery costs in excess of normal levels)
Cr Account 623 – Construction machinery costs.
d) Manufacturing overheads:
- Manufacturing overheads record the production costs of construction teams and sites, comprising: salaries of factory, crew and construction team management staff; social insurance, health insurance and trade union fee contributions calculated at the prescribed rates on the salaries payable to direct construction and installation workers, construction machinery operators and factory, crew and team management staff; depreciation of fixed assets used in common for the team’s activities and other costs relating to the team’s activities, etc. When these costs are incurred during the period, record:
Dr Account 627 – Manufacturing overheads
Dr Account 133 – Deductible VAT (if any)
Cr Accounts 111, 112, 152, 153, 214, 242, 334, 338,…
- At the end of the accounting period, based on the Manufacturing overhead allocation schedule, allocate and transfer manufacturing overheads to the relevant construction works and work items on an appropriate allocation basis, as follows:
Dr Account 154 – Work in progress
Dr Account 632 – Cost of goods sold (unallocated fixed manufacturing overheads not included in the cost of construction and installation works)
Cr Account 627 – Manufacturing overheads.
8.2. Method of recording and transferring construction and installation costs:
a) Contract costs incurred that cannot be recovered (for example, contracts that are not fully enforceable in law, such as where their validity is in doubt, or contracts under which the customer is unable to perform its obligations, etc.) must be recognised immediately as an expense for the period, as follows:
Dr Account 632 – Cost of goods sold
Cr Account 154 – Work in progress.
b) Costs directly related to each contract may be reduced by other income not included in contract revenue, for example proceeds from the sale of surplus raw materials and supplies and from the disposal of construction machinery and equipment at the end of the construction contract:
- Surplus raw materials and supplies received into the warehouse at the end of the construction contract, record:
Dr Account 152 – Raw materials and supplies (at historical cost)
Cr Account 154 – Work in progress.
- Scrap recovered and received into the warehouse, record:
Dr Account 152 – Raw materials and supplies (at recoverable value)
Cr Account 154 – Work in progress.
- Where surplus materials and recovered scrap are sold immediately without being received into the warehouse, the enterprise records the proceeds from the sale of the surplus materials as a reduction in costs:
Dr Accounts 111, 112, 131,…
Cr Account 3331 – VAT payable (33311)
Cr Account 154 – Work in progress.
- Accounting for the disposal of construction machinery and equipment used exclusively for a construction contract, where such fixed assets have been fully depreciated against their historical cost at the end of the construction contract:
- To record the proceeds from the disposal of the construction machinery and equipment, record:
Dr Accounts 111, 112, 131,…
Cr Account 3331 – VAT payable (33311)
Cr Account 154 – Work in progress.
- To record the costs of disposing of the machinery and equipment (if any), record:
Dr Account 154 – Work in progress
Dr Account 133 – Deductible VAT (1331)
Cr Accounts 111, 112,…
- To derecognise the fully depreciated fixed assets, being the specialised construction machinery and equipment disposed of, record:
Dr Account 214 – Accumulated depreciation of fixed assets
Cr Account 211 – Tangible fixed assets.
c) At the end of the accounting period, based on the actual production cost of the completed construction and installation products determined to have been sold (handed over in part or in full), or handed over to the main contractor:
- Where the construction and installation products are sold or handed over to the main contractor, record:
Dr Account 632 – Cost of goods sold
Cr Account 154 – Work in progress.
- Where the completed construction and installation products are awaiting sale (houses built for sale, etc.) or are completed but not yet handed over to the customer, based on the cost of the completed construction and installation products, record:
Dr Account 155 – Products
Cr Account 154 – Work in progress.
- When the enterprise estimates or determines the provision for construction warranty costs at the rate prescribed by the construction laws on the basis of the construction service revenue earned during the period, record:
Dr Account 641 – Selling expenses
Cr Account 352 – Provisions for liabilities (3522).
Source: full text of Circular 99/2025/TT-BTC published in the Official Gazette. Download the PDF here. The content has been reformatted for easier reference; please refer to the original text when applying it.