Account 623 – Construction machinery costs

TK 623Circular 99/2025Updated 26/11/2026

Extract from Appendix II – Circular 99/2025/TT-BTC dated 27 October 2025 of the Ministry of Finance, applicable to financial years beginning on or after 1 January 2026.

Category: Production and business cost accounts

Sub-accounts:

Code Level Account name
6231 2 Labour costs
6232 2 Material costs
6233 2 Production tool costs
6234 2 Depreciation of construction machinery
6237 2 Outsourced services
6238 2 Other cash expenses

See also: Accounting principles for expenses

1. Accounting principles

a) This account is used to accumulate and allocate the costs of using construction vehicles and machinery directly serving construction and installation activities where the enterprise carries out construction and installation using a mixed method, partly manual and partly mechanised.

b) Where the enterprise carries out construction and installation entirely by machine, Account 623 – Construction machinery costs is not used; instead, all direct construction and installation costs are recorded in Accounts 621, 622 and 627.

c) Contributions to social insurance, health insurance, trade union fees and unemployment insurance calculated on wages payable to workers operating construction vehicles and machinery are not recorded in Account 623 – Construction machinery costs. Construction machinery costs in excess of normal levels are not included in the cost of construction and installation works but are transferred immediately to Account 632 – Cost of goods sold.

2. Structure and content of Account 623 – Construction machinery costs

Debit side:

Costs incurred in relation to the operation of construction machinery (costs of materials for operating the machinery, wages and wage allowances and pay of workers directly operating the machinery, costs of maintenance and repair of construction vehicles and machinery, etc.). Costs of materials and other services serving construction vehicles and machinery.

Credit side:

  • Transfer of construction vehicle and machinery costs to the debit side of Account 154 – Work in progress.
  • Transfer of construction machinery costs in excess of normal levels to Account 632 – Cost of goods sold.

Account 623 has no closing balance.

Account 623 – Construction machinery costs has 6 level-2 accounts:

  • Account 6231 – Labour costs: Used to reflect basic wages, supplementary wages and wage allowances payable to workers directly operating construction vehicles and machinery and to workers serving construction machinery, such as transporting and supplying fuel, materials, etc. for construction vehicles and machinery.

This account does not reflect contributions to social insurance, health insurance and trade union fees under current regulations calculated on the wages of workers using construction vehicles and machinery. These contributions are reflected in Account 627 – Manufacturing overheads.

  • Account 6232 – Material costs: Used to reflect the costs of fuel (petrol, oil, grease, etc.) and other materials serving construction vehicles and machinery.
  • Account 6233 – Production tool costs: Used to reflect tools and instruments relating to the operation of construction vehicles and machinery.
  • Account 6234 – Depreciation of construction machinery: Used to reflect depreciation of construction vehicles and machinery used in construction and installation activities.
  • Account 6237 – Outsourced services: Used to reflect the costs of outsourced services such as outsourced repairs of construction vehicles and machinery; insurance premiums for construction vehicles and machinery; electricity and water costs, fixed asset rental, amounts paid to subcontractors, etc.
  • Account 6238 – Other cash expenses: Used to reflect cash expenses serving the operation of construction vehicles and machinery.

3. Accounting method for certain major economic transactions

The recording of construction vehicle and machinery costs depends on how construction machinery is used: organising a separate construction machinery team dedicated to performing mechanised construction work, or assigning construction machinery to construction and installation teams or enterprises:

a) If a separate construction vehicle and machinery team is organised, with delegated accounting and its own accounting function, the accounting is carried out as follows:

  • Record the costs relating to the operation of the construction vehicle and machinery team:

Dr Accounts 621, 622, 627
Cr Accounts 111, 112, 152, 331, 334, 214, …

  • At the end of the accounting period, transfer construction machinery costs to the debit side of Account 154 – Work in progress, record:

Dr Account 154 – Work in progress
Cr Accounts 621, 622, 627.

  • The costs of using vehicles and machinery are recorded and the cost per vehicle/machine shift is calculated in Account 154 – Work in progress on the basis of the machine-shift cost (at actual cost or internal contract price) provided to construction and installation objects (works and work items); depending on how the accounting function is organised and the relationship between the construction machinery team and the construction and installation unit, record:
  • If the enterprise applies the method of providing vehicle and machinery services among its departments, record:

Dr Account 623 – Construction machinery costs
Cr Account 154 – Work in progress.

  • If the enterprise applies the method of selling vehicle and machinery services among its internal departments, record:

Dr Account 623 – Construction machinery costs
Dr Account 133 – Deductible VAT (1331) (if any)
Cr Account 511 – Revenue from sales of goods and rendering of services (detailed for internal provision of services)
Cr Account 333 – Taxes and other payables to the State (33311) (VAT payable calculated on the internal selling price of vehicle/machine shifts sold as services) (if any).

b) If no separate construction vehicle and machinery team is organised, or a separate team is organised but without its own accounting function, all costs of using vehicles and machinery (including recurring costs and temporary costs such as wage allowances and mobility allowances for construction vehicles and machinery) are recorded as follows:

  • Based on wages, pay and other amounts payable to workers operating and serving vehicles and machinery, record:

Dr Account 623 – Construction machinery costs (6231)
Cr Account 334 – Payables to employees.

  • Value of materials, tools and instruments used for the operation of construction vehicles and machinery during the period, record:

Dr Account 623 – Construction machinery costs (6232, 6233)
Cr Accounts 152, 153, 242, …

  • Where materials, tools and instruments are purchased for immediate use (not through the warehouse) in the operation of construction vehicles and machinery during the period, record:

Dr Account 623 – Construction machinery costs (6232, 6233)
Dr Account 133 – Deductible VAT (if any)
Cr Accounts 111, 112, 331, …

  • Depreciation of construction vehicles and machinery used by the construction vehicle and machinery team, record:

Dr Account 623 – Construction machinery costs (6234)
Cr Account 214 – Accumulated depreciation of fixed assets.

  • Outsourced service costs incurred (repairs of construction vehicles and machinery, electricity, water, fixed asset rental, amounts paid to subcontractors, etc.), record:

Dr Account 623 – Construction machinery costs (6237)
Dr Account 133 – Deductible VAT (if any)
Cr Accounts 111, 112, 331, …

  • Other cash expenses incurred, record:

Dr Account 623 – Construction machinery costs (6238)
Dr Account 133 – Deductible VAT (if any)
Cr Accounts 111, 112, …

  • Based on the Allocation table of vehicle and machinery costs (actual cost per vehicle/machine shift) calculated for each work and work item, record:

Dr Account 154 – Work in progress (construction machinery cost item)
Dr Account 632 – Cost of goods sold (costs in excess of normal levels)
Cr Account 623 – Construction machinery costs.