Account 241 – Construction in progress

TK 241Archive: Circular 200/2014Updated 13/06/2020

This content follows Circular 200/2014/TT-BTC, replaced by Circular 99/2025/TT-BTC from 1 January 2026. It is kept for reference to prior years.→ See Account 241 under Circular 99/2025/TT-BTC

1. Accounting principles

a) This account is used only by entities that have not established a project management board, to reflect the costs of implementing capital construction investment projects (including costs of purchasing new fixed assets, new construction or repair, renovation, expansion or technical re-equipment of works) and the final settlement of capital construction investment projects at enterprises that purchase fixed assets, invest in capital construction or carry out major repairs of fixed assets.

The enterprise’s capital construction investment and major repairs of fixed assets may be carried out by contracting out or by the enterprise itself. At enterprises carrying out capital construction investment themselves, this account also reflects the costs incurred in the course of construction, installation and repair.

Entities that have established a construction investment project management board with a separate accounting system shall comply with Circular 195/2012/TT-BTC guiding the Accounting Regime for investor entities.

b) The costs of implementing capital construction investment projects are all costs necessary for new construction or repair, renovation, expansion or technical re-equipment of works. Capital construction investment costs are determined on the basis of the volume of work, the system of norms, economic and technical indicators and the State’s regimes and policies, and must also reflect objective market factors in each period and comply with the regulations on capital construction investment management.

Capital construction investment costs include:

– Construction costs;– Equipment costs;

– Compensation, support and resettlement costs;

– Project management costs;

– Construction investment consultancy costs

– Other costs.

Account 241 is detailed by each work and work item, and for each work item every type of capital construction investment cost must be recorded in detail and tracked cumulatively from commencement until the work or work item is completed, handed over and put into use.

c) In capital construction investment, construction and installation costs and equipment costs are usually charged directly to each work; project management costs and other costs are usually incurred in common. The investor must calculate and allocate project management costs and other costs to each work according to the following principles:

– If project management costs and other costs directly related to each work can be identified separately, they are charged directly to that work;

– Common project management costs and other costs relating to several works that cannot be charged directly to each work may be allocated by the entity using the criteria most appropriate to each work.

d) Where a project has been completed and put into use but the project’s final settlement has not yet been approved, the enterprise records an increase in the historical cost of fixed assets at a provisional value (the provisional value must be based on the actual costs incurred to acquire the fixed assets) in order to charge depreciation, but must subsequently adjust it to the approved final settlement value.

đ) Costs of repairing, servicing and maintaining fixed assets for normal operation are charged directly to production and business costs for the period. For fixed assets that technically require periodic repair, maintenance and servicing, the accountant may make provisions for payables and accrue them in advance to production and business costs to provide funding when the repair or maintenance occurs.

e) Real estate developers use this account to accumulate the costs of constructing fixed assets or investment property. Where the real estate constructed is used for multiple purposes (as offices, for lease or for sale, e.g. a mixed-use apartment building), the accountant still accumulates the costs directly related to the construction investment in Account 241. When the work or project is completed, handed over and put into use, the accountant transfers the construction investment costs in accordance with the nature of each type of asset, based on how the asset is actually used.

g) Exchange rate differences arising from capital construction investment are treated according to the following principles:

– Exchange rate differences in the pre-operating stage:

+ For enterprises 100% of whose charter capital is owned by the State and which perform national security, defence and macroeconomic stabilisation tasks, exchange rate differences relating to the pre-operating stage before production and business commence are accumulated in Account 413 – Exchange rate differences. When operations commence, the accountant may gradually allocate the exchange rate differences directly from Account 413 to Account 515 – Financial income (if a gain) or Account 635 – Financial expenses (if a loss). The allocation period must not exceed that prescribed by law, and the allocation of exchange losses must ensure that, if exchange losses are still reflected on the Debit side of Account 413, the income statement shows zero profit (the enterprise may not both reflect exchange losses under the indicator “Exchange rate differences” in the balance sheet and present profit after tax in the income statement).

+ For all other types of enterprises, exchange rate differences in the pre-operating stage are charged immediately to financial income (if a gain) or financial expenses (if a loss) when they arise; exchange rate differences may not be deferred in Account 413.

– Exchange rate differences relating to capital construction investment after the enterprise has commenced operations (including new investment or expansion investment):

All types of enterprises, including enterprises 100% of whose charter capital is held by the State and which perform national security, defence and macroeconomic stabilisation tasks, must immediately charge exchange rate differences relating to capital construction investment (including new investment or expansion investment) to financial income (if a gain) or financial expenses (if a loss) when they arise; exchange rate differences may not be reflected in Account 413.

h) Where an investment project is cancelled, the enterprise must liquidate it and recover the costs incurred on the project. The difference between the actual investment costs incurred and the liquidation proceeds is recognised in other expenses or recovered by determining the liability of organisations or individuals for compensation.

Account 241 – Construction in progress has 3 level-2 accounts:

– Account 2411 – Purchase of fixed assets: Reflects the costs of purchasing fixed assets and the settlement of those costs where the assets require installation and trial running before being put into use (including the purchase of new or used fixed assets). If purchased fixed assets require further investment or equipment before they can be used, all purchase and additional equipment costs are also reflected in this account.

– Account 2412 – Capital construction: Reflects capital construction investment costs and the settlement of capital construction investment capital. This account is detailed by each work and work item (by each asset formed through the investment), and for each asset every type of capital construction investment cost must be tracked in detail.

– Account 2413 – Major repairs of fixed assets: Reflects the costs of major repairs of fixed assets and the settlement of those costs. Routine repairs of fixed assets are not recorded in this account but are charged directly to production and business costs for the period.

**2. Structure and content of Account 241 – Construction in progress

Debit side:**

– Capital construction investment, purchase and major repair costs of fixed assets incurred (tangible and intangible fixed assets);

– Costs of renovating and upgrading fixed assets;

– Costs of purchasing investment property (where a construction investment stage is required);

– Capital construction investment costs of investment property;

– Costs incurred after initial recognition of fixed assets and investment property.

Credit side:

– Value of fixed assets formed through capital construction investment or purchase that have been completed and put into use;

– Value of works abandoned and other costs disallowed, transferred when the final settlement is approved;

– Value of completed major repair works on fixed assets, transferred when the final settlement is approved;

– Value of investment property formed through completed capital construction investment;

– Transfer of costs incurred after initial recognition of fixed assets and investment property to the relevant accounts.

Debit balance:

– Costs of construction investment projects and major repairs of fixed assets in progress;

– Value of construction works and major repairs of fixed assets completed but not yet handed over and put into use, or whose final settlement has not yet been approved;

– Value of investment property under construction.

3. Accounting method for certain major economic transactions

3.1. Accounting for capital construction investment costs

3.1.1. Advances to contractors

a) Advances in Vietnamese Dong:

– Recognise the advance to the contractor in Vietnamese Dong, record;

Dr Account 331 – Payables to suppliers Cr Account 112 – Cash in bank (1122) (weighted average book rate).

– On acceptance of completed capital construction work, the accountant recognises construction in progress costs for the amount advanced, record:

Dr Account 241 – Construction in progress Cr Account 331 – Payables to suppliers.

b) Advances in foreign currency:

– Recognise the advance to the contractor in foreign currency at the actual transaction exchange rate at the date of the advance, record;

Dr Account 331 – Payables to suppliers (actual transaction rate) Dr Account 635 – Financial expenses (if an exchange loss arises) Cr Account 112 – Cash in bank (1122) (weighted average book rate) Cr Account 515 – Financial income (if an exchange gain arises).

– On acceptance of completed capital construction work, the accountant recognises construction in progress costs for the amount advanced in foreign currency at the book rate (the actual transaction rate at the date of the advance), record:

Dr Account 241 – Construction in progress Cr Account 331 – Payables to suppliers.

3.1.2. On receipt of completed capital construction work or fixed asset repair work handed over by the contractor, if input VAT is deductible, based on the construction contract, the acceptance minutes of completed capital construction work and the sales invoice, record:

Dr Account 241 – Construction in progress (2412, 2413)

Dr Account 133 – Deductible VAT (1332) (if any) Cr Account 331 – Payables to suppliers.

– If input VAT is not deductible, the value of construction in progress costs includes VAT.

– Where the contract provides for payment to the contractor in foreign currency, the accountant recognises the amount payable (after deducting advances) at the actual transaction exchange rate at the date of acceptance (being the selling rate of the commercial bank with which the enterprise regularly transacts).

3.1.3. When equipment for capital construction investment is purchased, if input VAT is deductible, based on the invoice and goods received note, record:

Dr Account 152 – Raw materials (purchase price exclusive of VAT) Dr Account 133 – Deductible VAT (1332) Cr Account 331 – Payables to suppliers (total payment amount).

Where equipment not requiring installation is delivered directly to the construction site and handed over to the contractor, record:

Dr Account 241 – Construction in progress Dr Account 133 – Deductible VAT (1332) Cr Account 331 – Payables to suppliers Cr Account 151 – Goods in transit.

3.1.4. Payments to contractors and suppliers of materials, goods and services relating to capital construction investment, record:

Dr Account 331 – Payables to suppliers Cr Accounts 111, 112,…

3.1.5. Issue of capital construction investment equipment to the contractor:

a) For equipment not requiring installation, record:

Dr Account 241 – Construction in progress Cr Account 152 – Raw materials.

b) For equipment requiring installation:

– When equipment is issued to the contractor, the accountant only tracks in detail the equipment sent for installation.

– Only when the installation work completed by party B has been handed over, accepted and approved for payment is the value of the equipment sent for installation included in capital construction investment costs, record:

Dr Account 241 – Construction in progress (2412) Cr Account 152 – Raw materials.

3.1.6. When other costs are incurred, such as capitalised borrowing costs and bond issuance costs, bidding costs (after offsetting proceeds from the sale of bidding documents), and costs of dismantling and restoring the site (after offsetting recoverable scrap), etc., record:

Dr Account 241 – Construction in progress (2412) Dr Account 133 – Deductible VAT (1332) (if any) Cr Accounts 111, 112, 331, 335, 3411,343…

Any excess of proceeds from the sale of bidding documents over bidding costs is recorded as a reduction of construction investment costs (on the Credit side of Account 241).

3.1.7. Penalties collected from contractors in substance reduce the amount payable to the contractor, record:

Dr Accounts 112, 331 Cr Account 241 – Construction in progress.

3.1.8. Exchange rate differences arising during capital construction investment (including the pre-operating stage) are recognised in financial income (if a gain) or financial expenses (if a loss) when they arise (except for the enterprises specified in point 3.1.9 below):

– If an exchange gain arises, record:

Dr Relevant accounts Cr Account 515 – Financial income.

– If an exchange loss arises, record:

Dr Account 635 – Financial expenses Cr Relevant accounts.

3.1.9. For investors that are enterprises 100% of whose charter capital is owned by the State and which perform national security, defence and macroeconomic stabilisation tasks, if exchange rate differences arise in construction investment during the pre-operating stage (before production and business commence):

– If an exchange gain arises, record:

Dr Relevant accounts Cr Account 413 – Exchange rate differences.

– If an exchange loss arises, record:

Dr Account 413 – Exchange rate differences Cr Relevant accounts.

– When operations commence, the accountant transfers the exchange rate differences to financial income or financial expenses, record:

+ Transfer of exchange gains, record:

Dr Account 413 – Exchange rate differences Cr Account 515 – Financial income.

+ Transfer of exchange losses, record:

Dr Account 635 – Financial expenses Cr Account 413 – Exchange rate differences.

3.1.10. Trial running costs and proceeds from the sale of trial products are treated as follows:

a) For trial running costs that do not produce trial products:

Dr Account 241 – Construction in progress Cr Relevant accounts.

b) For trial production costs and proceeds from the sale of trial products:

– When costs of trial running under load to produce trial products are incurred, the accountant accumulates all the costs, record

Dr Account 154 – Work in progress Cr Relevant accounts.

– When trial products are received into the warehouse, record:

Dr Account 1551 – Finished goods in warehouse Cr Account 154 – Work in progress.

– When trial products are sold:

Dr Accounts 112, 131

Cr Account 1551 – Finished goods in warehouse Cr Account 154 – Work in progress (sold immediately without passing through the warehouse) Cr Account 3331 – VAT payable (if any).

– Transfer of the difference between trial production costs and proceeds from the sale of trial products:

+ Where trial production costs exceed the proceeds from the sale of trial products, the accountant transfers the difference to increase construction in progress costs, record:

Dr Account 241 – Construction in progress Cr Account 154 – Work in progress.

+ Where trial production costs are less than the proceeds from the sale of trial products, the accountant transfers the difference to reduce construction in progress costs, record:

Dr Account 154 – Work in progress Cr Account 241 – Construction in progress.

3.1.11. When the work is completed, overall acceptance has been carried out and the asset has been handed over and put into use: if the final settlement is approved immediately, the books are recorded based on the approved value of the asset formed through the investment. If the final settlement has not yet been approved, the value of the asset formed through the investment is recorded at a provisional value (the provisional value being the actual costs incurred to acquire the asset, determined based on Account 241). In both cases, record:

Dr Accounts 211, 213, 217 Dr Account 1557 – Real estate finished goods (where, on completion, part of the real estate is for sale and was not previously recorded separately in Account 154) Cr Account 241 – Construction in progress (approved value or provisional value).

Where the work has been completed but the asset handover procedures for putting it into use have not yet been carried out and the final settlement is pending preparation or approval, the accountant must open a detailed ledger for Account 241 “Construction in progress” to track separately the completed work awaiting handover and settlement approval.

3.1.12. When the final settlement of completed capital construction investment is approved, the accountant adjusts the provisional value to the approved value of the asset, record;

– If the approved value of the asset formed through capital construction investment is lower than the provisional value:

Dr Account 138 – Other receivables (disallowed costs to be recovered) Cr Accounts 211, 213, 217, 1557.

– If the approved value of the asset formed through capital construction investment is higher than the provisional value:

Dr Accounts 211, 213, 217, 1557 Cr Relevant accounts.

– If the fixed assets were invested from the capital construction investment fund and the competent authority permits an increase in business capital, at the same time record:

Dr Account 441 – Capital construction investment fund Cr Account 241 – Construction in progress (approved losses written off) Cr Account 411 – Owners’ invested capital (approved asset value).

– If the fixed assets were formed from the welfare fund and are used for welfare purposes, when the investor approves the final settlement of investment capital, the accountant records an increase in the welfare fund used to form fixed assets:

Dr Account 3532 – Welfare fund Cr Account 3533 – Welfare fund used to form fixed assets.

3.1.13. Where the enterprise, as investor, has established a Project Management Board to account separately for capital construction investment:

a) Accounting at the investor:

– On receipt of a work handed over for which the final settlement has been made, the investor recognises the value of the work at the settled value, record:

Dr Accounts 211, 213, 217, 1557 Dr Account 133 – Deductible VAT (if any) Dr Accounts 111, 112, 152, 153 Cr Account 136 – Intra-company receivables Cr Accounts 331, 333, … (assuming liabilities, if any).

– On receipt of a work handed over for which the final settlement has not yet been made, the investor recognises the value of the work at a provisional value. Upon final settlement, the value of the work must be adjusted to the settled value, record:

+ If the settled value is higher than the provisional value, record:

Dr Accounts 211, 213, 217, 1557 Cr Relevant accounts.

+ If the settled value is lower than the provisional value, record:

Dr Relevant accounts Cr Accounts 211, 213, 217, 1557.

b) Accounting at the Project Management Board: in accordance with Circular 195/2012/TT-BTC dated 15 November 2012 of the Ministry of Finance guiding accounting for investor entities and any amending, supplementing or replacing documents (if any).

3.1.14. Where an investment project is cancelled or revoked, the accountant liquidates the project and recovers the investment costs. The difference between the investment costs and the liquidation proceeds is reflected in other expenses or recovered by determining the liability of organisations or individuals for compensation, record:

Dr Accounts 111, 112 – Proceeds from liquidation of the project Dr Account 138 – Other receivables (amount to be compensated by organisations or individuals) Dr Account 811 – Other expenses (amount charged to expenses) Cr Account 241 – Construction in progress.

3.2. Accounting for repairs of fixed assets

Repairs of the enterprise’s fixed assets may also be carried out by the enterprise itself or by contracting out.

a) When fixed asset repair costs are incurred, they are accumulated on the Debit side of Account 241 “Construction in progress” (2413) and detailed by each repair work or job. Based on the cost documents, record:

– If input VAT is deductible, record:

Dr Account 241 – Construction in progress (2413) (purchase price exclusive of VAT) Dr Account 133 – Deductible VAT (1332) Cr Accounts 111, 112, 152, 214,… (total payment amount).

– If input VAT is not deductible, fixed asset repair costs include VAT, record:

Dr Account 241 – Construction in progress (2413) (total payment amount) Cr Accounts 111, 112, 152, 214, 334,… (total payment amount).

b) When the repair work is completed, if it does not qualify for an increase in the historical cost of fixed assets:

Dr Accounts 623, 627, 641, 642 Dr Account 242 – Prepaid expenses (if significant and allocated gradually) Dr Account 352 – Provisions for payables (if periodic repair costs were accrued in advance) Cr Account 241 – Construction in progress (2413).

– Where the renovation or upgrade satisfies the conditions for an increase in the historical cost of fixed assets, record:

Dr Account 211 – Tangible fixed assets Cr Account 241 – Construction in progress (2413).