Skip to content
INTA
INTA
Get a quote(028) 7303 2010

Account 623 – Construction Machinery Usage Costs

TK 623Archive: Circular 200/2014Updated 13/06/2020

This content follows Circular 200/2014/TT-BTC, replaced by Circular 99/2025/TT-BTC from 1 January 2026. It is kept for reference to prior years.→ See Account 623 under Circular 99/2025/TT-BTC

1. Accounting principles

a) This account is used to accumulate and allocate the costs of using construction vehicles and machinery directly serving construction and installation activities, where the enterprise carries out construction and installation using a mixed method, partly manual and partly by machine.

b) Where the enterprise carries out construction and installation entirely by machine, Account 623 “Construction machinery usage costs” is not used; all construction and installation costs are recorded directly in Accounts 621, 622 and 627.

c) Contributions to social insurance, health insurance, trade union fees and unemployment insurance calculated on wages payable to workers operating construction vehicles and machinery are not recorded in Account 623. Construction machinery usage costs in excess of normal levels are not included in the cost of construction and installation works but are transferred immediately to Account 632.

**2. Structure and content of Account 623 – Construction machinery usage costs

Debit side:** Costs related to the operation of construction machinery (materials for machine operation, wages, wage allowances and pay of workers directly operating the machines, maintenance and repair costs of construction vehicles and machinery…). Costs of materials and other services serving construction vehicles and machinery.

Credit side:

– Transfer of construction vehicle and machinery usage costs to the debit side of Account 154 “Work in progress”

– Transfer of construction machinery usage costs in excess of normal levels to Account 632.

Account 623 has no ending balance.

Account 623 – Construction machinery usage costs has 6 level-2 accounts:

– Account 6231 – Labour costs: Used to reflect basic wages, supplementary wages and wage allowances payable to workers directly operating construction vehicles and machinery and workers serving construction machinery, such as transporting and supplying fuel and materials… for construction vehicles and machinery. This account does not reflect contributions to social insurance, health insurance and trade union fees under current regulations calculated on the wages of workers using construction vehicles and machinery. These contributions are reflected in Account 627 “Manufacturing overheads”.

– Account 6232 – Material costs: Used to reflect the cost of fuel (petrol, oil, grease…) and other materials serving construction vehicles and machinery.

– Account 6233 – Production tools costs: Used to reflect tools and labour instruments related to the operation of construction vehicles and machinery.

– Account 6234 – Depreciation of construction machinery: Used to reflect depreciation of construction vehicles and machinery used in construction and installation activities.

– Account 6237 – Outsourced services costs: Used to reflect the cost of outsourced services such as outsourced repairs of construction vehicles and machinery; insurance for construction vehicles and machinery; electricity, water, rental of fixed assets, amounts paid to subcontractors,…

– Account 6238 – Other cash expenses: Used to reflect cash expenses serving the operation of construction vehicles and machinery.

3. Accounting method for certain major economic transactions

The recording of construction vehicle and machinery usage costs depends on how construction machinery is used: organising a separate construction machinery team specialising in machine-based work, or assigning construction machinery to construction and installation teams or enterprises:

a) If a separate construction vehicle and machinery team is organised, assigned its own accounting level and has its own accounting function, the accounting is carried out as follows:

– Record costs related to the operation of the construction vehicle and machinery team:

Dr Accounts 621, 622, 627 Cr Accounts 111, 112, 152, 331, 334, 214,…

– Record vehicle and machinery usage costs and calculate the cost per machine shift in Account 154 “Work in progress”, based on the cost per machine shift (at actual cost or internal contract price) provided to construction and installation objects (works, work items); depending on how the accounting function is organised and the relationship between the construction machinery team and the construction and installation unit, record as follows:

+ If the enterprise provides vehicle and machinery services between its departments:

Dr Account 623 – Construction machinery usage costs (6238 – Other cash expenses) Cr Account 154 – Work in progress.

+ If the enterprise sells vehicle and machinery services between internal departments:

Dr Account 623 – Construction machinery usage costs (6238 – Other cash expenses) Dr Account 133 – Deductible VAT (1331) (if any) Cr Account 333 – Taxes and other payables to the State (33311) (VAT payable calculated on the internal selling price of the vehicle and machine shifts sold as services) Cr Account 511 – Revenue from sales of goods and rendering of services (details of internal provision of services).

b) If no separate construction vehicle and machinery team is organised, or a separate team is organised but without its own accounting function, all vehicle and machinery usage costs (including regular costs and temporary costs such as wage allowances and mobility allowances for construction vehicles and machinery) are recorded as follows:

– Based on wages, pay and other amounts payable to workers operating and serving vehicles and machinery:

Dr Account 623 – Construction machinery usage costs (6231 – Labour costs) Cr Account 334 – Payables to employees.

– When materials, tools and supplies are issued from the warehouse for use in the operation of construction vehicles and machinery during the period:

Dr Account 623 – Construction machinery usage costs (6232 – Material costs) Cr Accounts 152, 153.

– Where materials and tools are purchased for immediate use (not through the warehouse) in the operation of construction vehicles and machinery during the period:

Dr Account 623 – Construction machinery usage costs (6232) Dr Account 133 – Deductible VAT (if deductible) Cr Accounts 331, 111, 112,…

– Depreciation of construction vehicles and machinery used by the construction vehicle and machinery team:

Dr Account 623 – Construction machinery usage costs (6234 – Depreciation of construction machinery)

Cr Account 214 – Accumulated depreciation of fixed assets.

– Outsourced services costs incurred (repairs of construction vehicles and machinery, electricity, water, rental of fixed assets, amounts paid to subcontractors,…):

Dr Account 623 – Construction machinery usage costs (6237) Dr Account 133 – Deductible VAT (if VAT is deductible) Cr Accounts 111, 112, 331,…

– Other cash expenses incurred:

Dr Account 623 – Construction machinery usage costs (6238 – Other cash expenses) Dr Account 133 – Deductible VAT (if VAT is deductible) Cr Accounts 111, 112,…

– Based on the Allocation table of vehicle and machinery usage costs (actual cost per vehicle and machine shift) calculated for each work and work item:

Dr Account 154 – Work in progress (construction machinery usage cost item) Dr Account 632 – Cost of goods sold (the portion of costs in excess of normal levels) Cr Account 623 – Construction machinery usage costs.

Call usGet a quote